This folio contains guides to build unlike structure-components.
Foundation lowering/raising techniques
Foundations tin only snap to each other on the same pinnacle which can exist inconvenient (specially if you lot desire to build on uneven ground). The following methods can be used to lower or raise your foundation in case there is something obstructing your building (or whatever other awarding where lowering/raising snap points is required)
Fast lowering (fastest & cheapest way)
- Stride 1 - Place a Colonnade on the ground.
- Step ii - Place an boosted Colonnade right next to the kickoff one (simply half a tile away) and use the lower snap bespeak
- Pace three - Destroy the commencement Pillar (else the game will brand information technology harder for you to identify the next Pillar lowered further)
- Step 4 - Identify a new Pillar in the place where the first ane (from Pace 1) was, this gives yous the second lowered snap point.
- Step five - Destroy the Pillar from Step two and you're back at the original position, only two steps lower to the basis.
- Tip - With a new update, you will be able to pick up the pillars in a short period of time, around 30 seconds to exist exact., if y'all happen to mess up.
Slow lowering (if you lot only want it one at a time)
- Step 1 - Place a Foundation on the basis
- Stride 2 - Place a Pillar into the Foundation
- Pace 3 - Identify a Foundation side by side to the 1st Foundation and use the lower snap point
Raising*
- Stride 1 - Place a Foundation on the ground
- Pace two - Place 2 Pillars on top of the Foundation
- Footstep 3 - Place 2 Ceilings next to each other onto the upper Colonnade
- Step 4 - Identify two Pillars downwards onto the second Ceiling (the one yet without a Pillar) and make sure to use the upper snap point for the 2nd Pillar!
- Step v - Place a Foundation adjacent to the Pillars from Pace iv (Notation that it has to be able to accomplish the ground in guild to enable the raised snap point.
Extended Ramp
First off, starting at the lesser you may be able to make a ramp that is flawless and has no steps but yous volition likewise spend two days of trial and error trying to get it far enough out from the cliff to get the angle to hit the top perfectly (See Advanced Ramping). Second off, this walkthrough is field of study to change as Ark is constantly updating and improving!
Starting at the acme you lot tin easily build down. Recommend the utilise of a slow flying mount or extreme caution and a parachute.
The formula is very unproblematic.
- Set foundations at the superlative of your cliff. This will exist the base of your ramp. If you lot cannot identify enough foundations for the width of the ramp yous desire, attach ceilings to the initial foundation and identify pillars underneath them (pillars must accomplish all the manner to the ground to count as foundation). Yeah, placing the colonnade first and then the ceiling DOES brand information technology wait prettier but it also alters the elevation of the ceiling which Will NOT DO. Ceilings must be placed first in the initial step because they will exist placed beginning to ensure proper colonnade placement later on. The pillars need something to snap to and this is the most reliable mode to practise so. All other methods are time consuming and use more materials and a great deal of trial and error.
- Survey the Area. Is your cliff initially very steep or is information technology gradual? Can you build 3 pillars downwardly and fit three ceilings on the pillar (the third ceiling existence the important i)? If amalgam a wider ramp you only need to exist able to do this on ane side of the ramp at any bespeak (either side, doesn't matter). If the ground does not slope steeply enough, you can't fit support underneath information technology. You lot'll have to brand your starting point larger using ceilings and pillars until y'all tin build out far enough. If it slopes too steeply... well, gosh, that'southward what this is designed for!
- Build three ceilings downward on the colonnade and iii ceilings out and build a pillar at the last ceiling all the way to the basis . This should be the maximum range of ceilings. It should extend two ceilings further than your pillar (not counting the first ceiling which is attached to the colonnade) and should exist placed three ceilings below the main platform. This means when placing the ceiling y'all should exist able to fit two ceilings between your extended ones and whatever was placed above. If your ramp is 3 ramps wide (big enough to accommodate any sized dinosaur including Brontosaurus) you volition need to build 2 more ceilings across the width of your ramp and build another pillar to the footing. For aesthetics, feel free to connect these ceilings to the colonnade behind them so they match what you lot already built merely it is non necessary. If you are building a wider ramp you may need to identify additional pillars in the middle (again, all the way to the ground).
- Continue building three ceilings out and three ceilings down and attaching pillars all the way to the basis on the outermost ceiling/corner. Ceilings must exist constructed prior to adding the ramps that will be intersecting them. If you identify the ramps start, you will be unable to proceed your ramp as you will be unable to attach any ceilings intersecting with ramps - they volition be "obstructed". Ramps, however, do not care what is in the way. They are ramps and do what they want.
- Add together ramps. Ensure that your ramps connect to the ceilings rather than to previous ramps. You want two ramps downward, a small step of ceiling, and then two more than ramps down. Otherwise, y'all end upward with ceiling jutting through your ramp and preventing a polish ascent. Ramps can extend up to 3 before requiring foundation support, but this only works if your ramp is only ane wide. When you attain the bottom you tin can get away with not building another ceiling scaffold (which may not fit) by merely placing pillars behind any ramps unwilling to place due to "No Foundation Back up". You lot can snap these pillars to the existing ceiling and build all the way to the ground.
Y'all are done.
Tips and Tricks
For those of you who accept pillars that refuse to reach the footing... Two ways to do this.
- If the ground is uneven and one pillar simply isn't long enough - destroy the pillar that is too short and build one attached to the ground instead of attached to the above pillar. Make sure the highlighted pillar snaps into place with the pillar above it before you place it! A crooked pillar may not work! They do not have to connect, connecting was just to ensure everything lines upwards.
- If the footing is fairly level and you accept other pillars nearby that HAVE reached the ground - destroy the pillar that is as well short and build one fastened to the ground instead of attached to the above pillar. Brand certain the highlighted pillar snaps into place with a pillar adjacent to it before you identify information technology and is lined upwardly properly! A crooked colonnade may not work! Pillars can snap very shut to some other pillar or farther away, make sure it lines upwards!
For pillars, ceilings, or ramps that refuse to place properly.
- Move yourself to a different spot and try from that position. Eventually you lot'll observe that sweet spot where the bending is just right and y'all can place the object with ease.
Advanced Ramping
Building a ramp like this is all about math. The ceilings and alternating edifice materials are for measuring and counting purposes, no ceilings are really necessary in the completed ramp except for the anchor at the top! Like any ramp it must be congenital from the top down and anchored with a ceiling/foundation along with foundation/pillar support along the ground underneath it.
This guide assumes you can figure out how to place your own pillars. See the Extended Ramp's Tips and Tricks if you demand assist.
- A smooth ramp repeats every vii ramps down, seven ceilings/foundations across, and xi pillars high (can repeat with x if the base of operations pillar is one-half in the basis). It tin intersect ceilings at one ceiling out (the top anchor), five ceilings out, and seven ceilings out.
Remember, if y'all cannot get it to intersect - ramps are not obstructed past ceilings but ceilings are obstructed past ramps. If yous have your steep slope, uneven cliff, or whatever else you lot need to ramp information technology upward yous'll showtime out a lot like a regular extended ramp with a few changes. The stop result should be much more than material efficient and less fourth dimension consuming over all!
- Set foundations at the meridian of your cliff - You lot can also use pillars. Over again set the number of evenly spaced pillars (careful, they can infinite unevenly, you want the bigger of the ii gap options!) at the acme of your cliff equal to the width of your desired ramp.
- Brand a stairway of pillars and ceilings to the base of the cliff - the base of the cliff should be the altitude you want your ramp to land on. Your staircase only needs to be ane colonnade broad at this time. If information technology is a three foundations wide ramp, build your staircase from the heart foundation and save yourself a lot of trouble. A straight staircase with lots of missing steps is your likely stop upshot. The new grappling hooks make it much safer to rappel downward the cliff and place your pillars for those long falls. Ceilings are only necessary hither in cases when you cannot identify the adjacent colonnade out from the cliff. Line it up with a ceiling!
- Count how many pillars tall your cliff is - your staircase should make this easier. Do non count more than one pillar per unit of altitude. Keep in mind that pillars do not identify like walls, they embed within the pillar above them. A column three pillars loftier has but two visible pillars. I used a spare pillar and rappelled down counting using the object placement highlight. You could also build ceilings out from your top and build up pillars from the base of your ramp until the two are the aforementioned altitude for counting.
You have the number of pillars tall your cliff is. Now for the math part.
Word Problems, Partition
- Stride 1a - If your vertical pillar number is evenly divisible past eleven, congratulations you have the best ramps of all ramps. You will need to build six pillar supports abroad from your top anchor (non counting the anchoring colonnade) for each xi vertical pillars. Skip to Stride 4.
- Pace 1b - If your vertical pillar number is non evenly divisible by 11 but is greater than eleven, all is not lost. If it is less than eleven skip to Pace 2a. Divide the vertical pillars past 11 anyway and note the residual. Run into Footstep 1a for how to place your initial colonnade supports.
- Step 2a - If your vertical pillar remainder is evenly divisible by six, y'all have the 2nd best ramp. You will need to build 4 pillar supports away from the existing pillar supports.
- Step 2b - If your vertical pillar remainder is non evenly divisible past six but is greater than x, you take the worst job. If it is less than vi, skip to Step 3a. Split up the it by six and note the remainder. Encounter Step 2a for how to place your next batch of colonnade supports.
- Stride 3a - Your vertical pillar remainder should be between i and four. If it is non, you skipped a step you shouldn't accept. Do not pass Go. Do not collect $200. Go back and fix it. If information technology is, keep to Step 3b.
- Footstep 3b - If your vertical pillar remainder is less than or equal to 2, complete your ramp, no additional supports are needed. If your vertical colonnade remainder is three, place one additional colonnade back up. If it is four, identify two.
- Step 4 - Consummate
- Build your ramp - Start at the top and zoom your way downwardly.
External Resources
- Building Guide Video: Howto Pillar without poking through Ceilings, Extend Ceilings far, using of ViewModes